Send us a brief description of your query and someone from the RMD team will call you back.

1800 111 763

  • This field is for validation purposes and should be left unchanged.

Projects 

Clemton Park Village - Rapidshor and Airodek

Article Details

  • SYSTEM Shoring, Soffit Support
  • PRODUCT Airodek, Rapidshor
  • STRUCTURE TYPE Airports and Ports, Bridges, Commercial, Hi-Rise, Industrial, Leisure, Medical Facilities, Mining, Rail, Repair Maintenance and Improvement, Retail, Stadiums, Utilities, Viaducts
  • REGION Australia & New Zealand

The client was very happy with RMD Australia because of the speed and simplicity of the Airodek system. The builder, Parkview was pleased with the Airodek system from a safety point of view. Also the versatility of the Rapidshor system allowing for three different types of cantilevered edge protection was admired.

Clemton Park Village – Rapidshor and Airodek

Situated just 13km from Sydney’s CBD in its sought-after inner west, Clemton Park Village provides an excellent lifestyle. It is close to a diverse range of entertainment attractions, such as: shops – including a Coles Supermarket, schools, employment opportunities and fresh food outlets that are freely available.

Clemton Park Village specifically consists of six apartment buildings, with basement carparks and a Coles Shopping Centre. Rob Novak from RMD Sydney worked with the Formwork Subcontractor on the project.

The Rapidshor shoring system was used for high strutting
RMD’s Rapidshor shoring system was used for high strutting to 6.5m and 9.5m, whilst supporting the safe and easy to use Airodek Deck Beams and Panels soffit system for the floor slabs. In more typical slab areas the more simple Airodek Prop and Panel system was used for floor slabs.

The total floor area created using these two methods was 11,000m2 of Rapidshor and 3,000m2 of Airodek panels with No.2 props.

IMG_3014 4

Happy with the speed and simplicity of the Airodek system
The client was very happy with RMD Australia because of the speed and simplicity of the Airodek system. The builder Parkview was pleased with the Airodek system from a safety point of view, because Airodek Panels have the composite sheets integrated into the aluminium frame, therefore the site was clean and free of the typical timber offcuts laying around on the site.

The Rapidshor system allowed for three different types of cantilevered edge protection
Also the versatility of the Rapidshor system allowed for three different types of cantilevered edge protection that allowed Westform Contractors to continue forming slabs right up to the edge, without the need to form the edge of the slab using additional high strutting shoring or pour the lower slab immediately next to the slab being formed.

What would you like to do next?

Print

Share

  • Share via Twitter Share via Facebook Share via Facebook Share

For further information please call our Branch Network via our 1800 No.

If you have an questions or comments or would like further information relating to our products and services please do not hesitate to contact your local branch.

Call to Action

RMD Branch Network

1800 111 763

Contact RMD Branch Network

    Please send me updates about RMD Kwikform
  • This field is for validation purposes and should be left unchanged.