Conventional Basement and Home Formwork – Superslims
This project consisted of an insitu basement with internal and external walls for a house in Glenunga, Adelaide.
Conventional formwork was used because a class 2 finish was required
The house owner required a class 2 finish for all of the walls because he plans to leave all of the walls exposed. To help create the best possible finish Faraone Constructions decided to use 17mm F14 Plywood, Superslim Soldiers for their extra support and 95 x 65 timber wales. The walls ranged in height from 2.7m to 3.0m. The entire job was formed and poured in one go.
The Stakeholders were happy
Both the client and the owner were very pleased with the RMD Adelaide system supplied.